|
1987
|
Four technicians of the sector of the construction of automatic machines, pushed by the desire to see to increase the experiences up to that moment accumulated, damage life to the CIEMME S.N.C. In the structure of 300 Mqs of work shop are realized electric wirings and mechanical assemblages for account third.
|
|
|
1995
|
CIEMME S.N.C. moves to an ampler center, of 600 Mqs of workshop and offices, in which are realized more complexes plants and mechanical assemblages of complete machines. On the push of the applications of the clients the electric technical office is created, to give a more professional support to the clients and to realize for them plans of machines. The personnel employee in this phase is composed from 10 unities.
|
|
|
1998
|
CIEMME S.N.C. moves to the actual center, that contains 2000 Mqs of workshop and a palace to two floors for offices. The technical office is widened. The technical personnel and of workshop passes from 10 to 15 unities.
|
|
|
1999
|
The society TEMCO GROUP S.R.L is born, realized for facing the required more and more ample of the market. This society deals with the mechanical planning and realization of automatic machines. The offices are situated to the second floor of the palace. For a more flexible management the office production is also created, that manages the purchases and the mechanical realizations of details to sketch.
|
|
|
2003
|
CIEMME S.N.C. subsequently expands, acquiring a further structure of 2000 Mqs, beside that actual, to make forehead to grows demands of production.
|
|
|
2006
|
CIEMME S.N.C. and TEMCO GROUP S.R.L. melt in an only society, denominated CIEMME GROUP S.R.L., in degree to constitute for the many clients of the sector of the packaging and the industrial automation a valid partner for the mechanical and electric planning, the electric wiring and the mechanical assemblage of automatic machines, plants and lines of production.
|
|
|
2009
|
CIEMME GROUP S.R.L. moves to actual site in Viale Marconi, 5 in Anzola Emilia (BO), where at the activities of mechanical and electric planning, electric wiring and mechanical assemblage units even that of construction of mechanical pieces.
|
|
|